Tower Crane Power
Eliminate crane-induced generator oversizing
Tower cranes create the highest instantaneous load events on any construction site. Battery storage absorbs lift peaks, right-sizes the generator, and eliminates voltage dips.
The Problem
Tower cranes pull 3–5x their average load during the acceleration phase of each lift. A crane drawing 55 kW average may demand 150–200 kW for 4–8 seconds during each hoist cycle. Generators must be sized for this peak, forcing them to operate at 20–30% average load — the most inefficient point in the diesel combustion curve. Every site with a diesel-only generator feeding a tower crane is burning excess fuel and accumulating unnecessary engine hours.
Traditional Approach
The standard approach is to specify a generator large enough to handle the worst-case crane lift peak, then run it continuously whether the crane is active or idle. Some sites add a second smaller generator for off-hours loads, requiring manual transfer switching. Neither approach addresses the root inefficiency.
BuildingFab Solution
The BuildingFab GRES (Grid Responsive Energy System) is installed between the generator and the crane distribution panel. During each lift cycle, the BESS supplies the instantaneous peak demand while the generator maintains a steady, efficient output. Between lift cycles, the generator charges the battery bank. The generator is typically right-sized at 35–45% below the peak-only specification, operating at 75–85% load — its most efficient operating point.
Key Benefits
Generator right-sized for average load, not crane peak — 30–40% smaller unit
Fuel consumption reduced by 35–55% on crane-dominated sites
Voltage stability maintained across all site distribution during lifts
Silent operation during noise-restricted hours using battery-only mode
Generator engine hours reduced by up to 50%, extending service intervals
No crane speed reduction to accommodate generator capacity
Recommended Systems
Frequently Asked Questions
Related Reading
What Is Hybrid Construction Power?
A practical guide to how battery energy storage systems work alongside generators on modern construction sites — and why the industry is moving away from diesel-only power.
Generator vs Generator + BESS: The Complete Comparison
A detailed look at the real cost and operational differences between running a diesel generator alone versus a hybrid generator and battery system on a construction project.
Powering Tower Cranes with Battery Storage
Tower cranes are the highest peak-load event on any construction site. Here is how battery storage systems absorb crane lift peaks, reduce generator sizing, and eliminate load-related voltage problems.
Get Started
Ready to deploy Tower Crane Power on your project?
BuildingFab's team will size the right system for your specific load profile and deployment requirements.