Division 02 — Data Center Infrastructure

Power Infrastructure Built for AI Data Centers

Behind-the-meter battery storage, containerized substations, and modular UPS systems for hyperscale campuses. Pair storage with turbines and generators for remote, bring-your-own-power projects, or integrate with existing utility-connected infrastructure.

500kW to multi-MW
Factory Pre-Tested
Deployment-Ready

Enterprise-Grade Product Lines

UPS, BESS & Substations · Lead Times

12–16 weeks production lead time, plus 4–8 weeks for shipping.

Expediting options are available. Contact us to discuss your project schedule.

BuildingFab Power Architecture

Monitoring & ControlsBackup Energy StorageUTILITYMVXFMRMVSWITCHGEARLVSWITCHBOARDUPS /BESSPANELBOARD

Inside a BuildingFab Power Block

Medium Voltage Transformers

Step-down from utility MV to distribution LV. Factory-wound, tested, and integrated with protection systems before leaving the factory floor.

Low Voltage Switchboards

Main distribution boards factory assembled with breakers, metering, and controls. Tested under load prior to shipment.

Distribution Panelboards

Branch circuit distribution factory wired and tested. Labeled, documented, and ready for connection on arrival.

UPS Systems

Modular lithium-ion UPS from 500kW to multi-MW. Pre-integrated with battery strings and controls.

Battery Energy Storage

Grid-scale and data center BESS with integrated BMS, thermal management, and fire suppression interfaces.

Cable Bus & Busway

High-ampacity distribution integrated and tested within the power block structure.

Integrated Controls & Monitoring

SCADA, metering, protection relays, and communications pre-configured and tested as a system.

E-House Structure

Steel-framed electrical rooms with HVAC, lighting, cable management, and NEC-compliant working clearances built in.

Why AI Data Centers Need New Power Architectures

AI training and inference workloads do not look like traditional cloud workloads. GPU clusters create massive, volatile power swings that stress conventional electrical infrastructure and grid connections.

  • Dramatic power density growth per rack
  • Severe load spikes during training runs
  • Grid constraints forcing on-site peak shaving
  • Extreme speed-to-market pressures

Traditional vs AI Load Volatility (kW)

Flexible OEM Integration

We do not lock you into a single manufacturer—we provide the engineering and integration wrapper that guarantees the system works perfectly together.

Global OEM Sourcing

BuildingFab sources components from qualified OEM partners across multiple regions. This eliminates single-source dependency and protects customers from supply chain disruptions.

Engineering Integration

Components from multiple OEMs are engineered into a unified system. Interface design, protection coordination, controls integration, and system-level FAT are performed centrally.

Unified Warranty

Instead of managing separate warranties for switchgear, UPS, and batteries across multiple vendors, BuildingFab provides a single point of responsibility for the integrated system.

Factory-Built vs Traditional Field Construction

CriteriaTraditional Field ConstructionBuildingFab Factory Integration
Integration ResponsibilityMultiple vendors, site coordinated, highly fractured.Single integration platform, assembled before shipping.
Deployment ScheduleSequential, weather dependent, long commissioning.Parallel manufacturing, accelerated delivery.
Labor ExposureHigh local field labor requirements and costs.Shifted to controlled factory environment.
Quality AssuranceField tested under varying site conditions.Rigorous factory acceptance testing (FAT) prior to deployment.

Data Center Infrastructure — FAQ