Division 01 — Construction Power

Hybrid Power Built for Construction

Mobile battery and hybrid generator systems that reduce fuel, eliminate noise restrictions, and keep construction schedules on track.

30–60% Fuel Reduction
Deploys in Hours
CONSTRUCTION POWER SYSTEMS

Hybrid Construction Power Systems

Deployable battery and hybrid generator systems designed for modern jobsites, rental fleets, and temporary power applications.

GENGRESLOAD
Cabinet Hybrid Power System

GRES

Grid Responsive Energy System

Mobile Hybrid Power for Modern Jobsites

Battery-assisted temporary power system designed to reduce generator runtime, support crane loads, and enable silent operation on construction sites.

Peak ShavingSilent ModeGenerator HybridCrane ReadyMobile DeploymentRental Fleet ReadyRapid InstallReduced Fuel Burn
Cabinet Form Factor
Modular Battery Architecture
Hybrid Generator Integration
Rapid Deployment
Low Noise Operation
Remote Monitoring Capable
GENERATORSteady efficient loadGRESPeak absorption + silent modeJOBSITE LOADStable reliable power
GEN 1GEN 2BRESSITE DIST
Containerized Hybrid Power Platform

BRES

BuildingFab Responsive Energy System

Containerized Power Infrastructure for Large-Scale Deployment

High-capacity hybrid power platform designed for mega projects, temporary infrastructure, and high-load construction deployment.

Utility ScaleHybrid Generator SupportTemporary InfrastructureSilent Power ModeRapid Site DeploymentFleet DeployableModular CapacityConstruction Ready
Containerized Architecture
High-Capacity Battery System
Generator Parallel Capability
Modular Deployment
Remote Monitoring
Industrial Cooling Design
UTILITY / GENERATORDual source inputBRESBuffer + stabilize + dispatchSITE DISTRIBUTIONScalable site power

Applications

Tower Cranes
Temporary Site Power
Urban Construction
Night Work
Rental Fleets
Utility-Constrained Sites
THE CASE FOR HYBRID POWER

Why the Industry Is Moving to Hybrid Power

Traditional Diesel-Only

OVERSIZED GEN25% Efficient
  • Oversized generators for peak demand
  • Runs 24/7 at low load efficiency
  • High fuel cost, frequent maintenance
  • Excluded from noise-restricted sites
  • No silent operation capability

BuildingFab Hybrid System

RIGHT-SIZEDGENBESS85% Efficient
  • Right-sized generator + BESS buffer
  • Generator runs only at peak efficiency band
  • 30–60% fuel reduction in practice
  • Silent operation mode available
  • Wins noise-restricted and ESG contracts
30–60%
Fuel Reduction
<2 hrs
Deployment Time
24/7
Silent Capable

Built for Rental Deployment

Both GRES and BRES are engineered from the ground up for rental fleet operations — ruggedized, transport-ready, and field-serviceable.

Ruggedized Enclosure
Transport Ready
Rapid Hookup
Telematics Capable
Fleet Scalable
Field Maintainable
Traditional DieselGEN20-30% LoadLOADHybrid PowerGEN80% LoadBESSPeak AbsorptionLOAD

The Problem With Diesel-Only Power

Generators sized for peak loads spend most of their runtime at 20–30% capacity — burning fuel, accumulating engine hours, and producing emissions — without productive work. This is the fundamental inefficiency hybrid power solves.

The Hybrid Solution

BESS absorbs demand peaks. The generator runs at its efficient band (70–85% load) to charge the battery, then shuts down during low-demand periods.

Result: dramatic fuel savings, extended service life, and silent operating windows.

Where Construction Power Deploys

Tower Cranes

Problem

Cranes pull 3–5× their average load during lifts. Generators sized for crane peaks idle inefficiently between lifts.

Solution

Crane-assist BESS absorbs instantaneous lift loads. Generator sizes to average, not peak.

Outcomes

Smaller gen spec, zero lift delays, silent overnight.

Site Temporary Power

Problem

Unpredictable site loads cause voltage fluctuations, fuel waste, and generator overloads.

Solution

BESS acts as a buffer, stabilizing voltage and allowing the generator to right-size to average demand.

Outcomes

Stable power, lower fuel, overnight quiet.

Urban Construction

Problem

Noise ordinances restrict diesel generators overnight and weekends. Emissions limits apply in downtown zones.

Solution

Pre-charged BESS supplies overnight and weekend loads silently. Hybrid keeps diesel within permitted hours.

Outcomes

Ordinance compliant, permit-friendly, full schedule.

Remote Jobsites

Problem

Fuel logistics to remote sites is expensive and complex. Generator servicing requires long mobilizations.

Solution

Hybrid operation cuts fuel deliveries significantly. Remote monitoring tracks health proactively.

Outcomes

Fewer fuel runs, remote diagnostics, extended service.

WEAK GRID

Utility-Constrained Sites

Problem

Permanent power drops delayed months. Temporary utility feeds too small for full construction loads.

Solution

BESS demand-manages within the available feed. Generator supplements during peaks. System bridges until permanent power arrives.

Outcomes

Full pace on undersized feed, utility delay bridged, rapid setup.

Standard Fleet Configurations

Trailer-Mounted BESS

Maximum mobility for rapid deployment.

Roadable | Hook-up in <2hrs

Skid-Mounted BESS

Stable footprint for medium-term sites.

Crane/Forklift | Small Footprint

Containerized BESS

High capacity for large scale projects.

ISO Transport | Multi-MW Scale

Crane-Assist Module

Optimized specifically for lift operations.

High Peak Discharge | Compact

Built for Rental Fleet Operators

BuildingFab's partner program gives rental companies everything needed to operate and grow a hybrid power fleet — not just the hardware.

  • White-label / co-branding
  • Technical training
  • Spare parts supply
  • Remote fleet monitoring
  • Deployment planning support
  • Custom configurations
White-Label Ready
Fleet Monitoring
Co-branded Options
Training Included
Parts Support
Custom Configs

Why Contractors Specify Hybrid Power

Emissions Targets

Meets strict urban air quality regulations.

Noise Ordinances

Silent operation enables 24/7 work.

Fuel Costs

Cuts diesel expenditure by 30-60%.

Reliability

Eliminates voltage drops during motor starts.

Grid Delays

Bridges the gap until utility connection.

Space Constraints

Smaller generators save valuable site space.

ESG Reporting

Provides concrete carbon reduction data.

Maintenance

Fewer generator oil changes and service calls.

Construction Power — FAQ