Equipment Charging
Charge electric plant from hybrid power without generator oversizing
Electric construction plant — mini excavators, telehandlers, compactors — requires high-rate DC charging that would otherwise demand large generator capacity. Hybrid power enables fast charging without oversizing.
The Problem
Electric construction equipment is arriving on site faster than charging infrastructure is being planned for it. A 60 kWh mini excavator requiring a 50 kW fast charge adds directly to site peak demand. Charging multiple machines simultaneously creates a demand spike that — without a buffer — requires a significantly larger generator than the rest of the site needs. On sites with a mix of diesel and electric plant, generator sizing becomes driven by charging cycles rather than by primary construction loads.
Traditional Approach
Most sites with electric plant either limit simultaneous charging (creating operational scheduling problems) or oversize the generator to handle worst-case simultaneous charging peaks. Neither approach is satisfactory as electric plant fleets grow.
BuildingFab Solution
The GRES or BRES system provides a high-capacity charging output that the BESS supplies from stored energy, not directly from the generator. The generator charges the BESS at a steady, efficient rate throughout the day. Electric plant charges from the BESS at whatever rate the equipment requires. The generator never sees a charging-induced peak. As the electric plant fleet grows, charging capacity can be increased by adding BESS capacity without modifying the generator.
Key Benefits
Electric plant charging does not increase generator peak demand
Multiple machines can charge simultaneously without generator upgrade
Generator sized for primary construction loads, not charging spikes
BESS charges electric plant faster than generator-limited DC charging
Fleet-scalable — add BESS capacity as electric plant fleet grows
Supports mixed diesel and electric plant sites without configuration changes
Recommended Systems
Frequently Asked Questions
Related Reading
What Is Hybrid Construction Power?
A practical guide to how battery energy storage systems work alongside generators on modern construction sites — and why the industry is moving away from diesel-only power.
Generator vs Generator + BESS: The Complete Comparison
A detailed look at the real cost and operational differences between running a diesel generator alone versus a hybrid generator and battery system on a construction project.
Powering Tower Cranes with Battery Storage
Tower cranes are the highest peak-load event on any construction site. Here is how battery storage systems absorb crane lift peaks, reduce generator sizing, and eliminate load-related voltage problems.
Get Started
Ready to deploy Equipment Charging on your project?
BuildingFab's team will size the right system for your specific load profile and deployment requirements.