Data Center

AI Campus Power Blocks

Factory-built electrical infrastructure for rapid AI data center deployment

AI data center campuses require rapid deployment of large-scale electrical infrastructure. BuildingFab's modular power blocks deliver factory-tested UPS, BESS, switchgear, and distribution in a single deployable unit.

The Problem

Hyperscale and edge AI data center projects are under intense schedule pressure. A campus delivering 50–200 MW of compute capacity must have electrical infrastructure ready when servers arrive — not months later. Traditional site-built electrical rooms require sequential installation of switchgear, transformers, UPS, and distribution equipment by multiple trades, with integration testing only possible at the end of the sequence. This approach cannot compress below 18–24 months for a large installation.

Traditional Approach

The traditional approach to data center electrical infrastructure is a custom-designed, built-in-place electrical room containing switchgear, transformers, UPS rows, and battery strings installed and wired on-site. Engineering, procurement, delivery, installation, and commissioning happen in sequence. Schedule compression is limited by the sequential nature of on-site work and the lead time on major equipment such as transformers and switchgear.

BuildingFab Solution

BuildingFab delivers modular power blocks: factory-assembled and factory-tested electrical infrastructure units combining medium-voltage switchgear, step-down transformers, modular UPS, lithium iron phosphate BESS, and low-voltage distribution in a single e-house enclosure. Factory assembly in parallel with site civil works compresses the critical path. Factory acceptance testing (FAT) verifies the complete integrated system before shipment — eliminating the late-stage integration issues that routinely delay site-built systems.

Key Benefits

Electrical infrastructure delivery time reduced to 8–14 months vs 18–36 months

Factory acceptance testing eliminates integration issues on site

Modular architecture enables phased energization as compute demand grows

Factory assembly in controlled environment improves workmanship quality

Complete documentation package (as-built, FAT records, O&M manuals) at delivery

Scalable from 5 MW to 100 MW+ per campus through modular addition

Frequently Asked Questions

Get Started

Ready to deploy AI Campus Power Blocks on your project?

BuildingFab's team will size the right system for your specific load profile and deployment requirements.